Blog Layout

APEX HOUSE

APEX HOUSE Wembley / New Build

Date of works

January 2017 – September 2017

Project description

Client utilised modern methods of construction for this HTA designed mixed use Leisure and student accommodation scheme located in Wembley, with the building formed from prefabricated volumetric modular units. Installation of the integrated façade package including GRC, metal and terracotta rainscreens, perforated panels, curtain wall, and aluminium feature fins.
22 January 2020
April 2019 – ongoing
22 January 2020
August 2017 – June 2018
22 January 2020
May 2018 – October 2018
Show More
Share by: